AXLEON
AXLEON
IATF 16949:2016PPAP Level 3DFM in 48 h

Auto parts that pass PPAP from the first sample.

OEM/ODM factory in Ningbo — brake, chassis, powertrain and housing parts · ±0.01 mm tolerance · send a drawing, get DFM feedback in 48 hours · sample with CMM report in 15 days

86CNC machines
±0.01 mmMachining tolerance
≤ 25 PPMDefect rate 2025
40Export countries

Delivered programmes

Programmes through PPAP and in serial production

4 brake-disc variants for a European Tier-1
0 PPM4 brake-disc variants for a European Tier-1100% ≤ 0.03 mm · 180,000 pcs/yr
ADC12 sensor housings for a Japanese brand
1 roundADC12 sensor housings for a Japanese brandPPAP approved first round · 240,000 pcs/yr
Forged control arms for the US aftermarket
1M cyclesForged control arms for the US aftermarketIndependent lab passed · 12 part numbers
10.9 bolts and brackets for an EV plant in Mexico
100%10.9 bolts and brackets for an EV plant in Mexico100% on time for 18 months

Product lines

Why Tier-1 buyers move programmes to us

OE tolerance, every lot

Three CMMs measure every lot to the control plan. The report ships with the parts, unasked.

DFM feedback in 48 hours

Twelve engineers review your drawing and flag cost-down options that keep the spec, before we quote.

Cast, forge, stamp and machine under one roof

No sub-tier suppliers. We control the schedule and quality across the whole line — 98.6% on-time delivery.

Full PPAP from the first sample

PSW, FMEA, control plan, MSA and material certs ship with the sample so approval takes one round.

Measuring & test lab

Every programme has its own control plan. Gauges are calibrated every 6 months and test records are kept for 15 years per IATF.

  • 3 Zeiss CMMs, 1.5 µm
  • Surface roughness & roundness testers
  • 500 h salt spray · 1M-cycle fatigue rig
  • Spectrometer check on every incoming heat
Measuring & test lab

On the shop floor

AXLEONAXLEONAXLEONAXLEON

From drawing to mass production

  1. Send drawing & volumes2D/3D files, material, annual volume — via the form below or e-mail
  2. DFM & quote in 48 hDesign notes, tooling risks, piece price by volume
  3. Sample & PPAP in 15–30 daysSamples with CMM report and Level 3 PPAP pack
  4. Mass production on scheduleSPC every shift, full lot traceability, FOB Ningbo

Standards & certifications

IATF 16949:2016ISO 9001:2015ISO 14001:2015PPAP Level 3VDA 6.3RoHS · REACH

Tier-1 suppliers on three continents keep programmes with AXLEON for 6.4 years on average

98.6% on-time delivery in 2025 · customer-detected defects ≤ 25 PPM · 14 customer audits, all passed

Meet us at

Automechanika FrankfurtFrankfurt — Sep 2026
AAPEXLas Vegas — Nov 2026
Automechanika ShanghaiShanghai — Dec 2026
Equip AutoParis — Oct 2027

Export markets

GermanyUSAMexicoBrazilTurkeyPolandItalyJapanThailandAustraliaUAESouth Africa

Send your drawing — DFM and quote within 48 hours

Attach 2D/3D files (STEP, DWG, PDF), material, annual volume and required standards. Our engineers reply with design notes and piece price.

  • IATF 16949:2016
  • PPAP Level 3
  • DFM in 48 h

Talk to sales

Reply within one working day — English, Chinese and Thai

Tel+86 574 8600 1188
WhatsApp+86 137 0574 0088
WeChataxleon-sales
E-mailsales@axleon-auto.com
HoursMon–Fri 8:30–17:30 (GMT+8)
AddressNo. 88 Dagang Road, Beilun District, Ningbo, Zhejiang
Get quote
Template
สี
ฟอนต์