OEM/ODM factory in Ningbo — brake, chassis, powertrain and housing parts · ±0.01 mm tolerance · send a drawing, get DFM feedback in 48 hours · sample with CMM report in 15 days

Discs, drums, calipers, pad backing plates — cast, machined, balanced and coated under one roof
New
Vented brake disc Ø280–380
MaterialG3000 cast ironMOQ500 pcsLead time35 d
Get price
New
Light-truck brake drum
MaterialHT250 cast ironMOQ300 pcsLead time35 d
Get price
Aluminium caliper housing
MaterialA356-T6MOQ500 pcsLead time40 d
Get price
Pad backing plate
MaterialSPHC 4–6 mmMOQ5,000 pcsLead time25 d
Get price
Control arms, ball joints, tie rods, knuckles — forged and CNC-machined, fatigue-tested every lot
New
Forged lower control arm
Material40Cr forgedMOQ300 pcsLead time45 d
Get price
New
Ball joint assembly
MaterialSCM435 · POM seatMOQ1,000 pcsLead time40 d
Get price
Outer tie rod end
Material45# steelMOQ1,000 pcsLead time35 d
Get price
Ductile-iron steering knuckle
MaterialQT500-7MOQ200 pcsLead time45 d
Get price
Camshafts, gears, pulleys, flywheels — 5-axis machined to ±0.01 mm
New
Chilled-cast camshaft
MaterialChilled cast ironMOQ200 pcsLead time50 d
Get price
New
CNC-cut transmission gear
Material20CrMnTiMOQ500 pcsLead time45 d
Get price
Crankshaft pulley
MaterialCast iron · rubber damperMOQ500 pcsLead time40 d
Get price
Flywheel
MaterialHT250MOQ300 pcsLead time40 d
Get price
Sensor housings, ECU enclosures, pump housings, aluminium brackets — A380/ADC12 die-cast and finish-machined
Grade 10.9 bolts, brackets, clips, heat shields — stamped on 25–630 t presses, zinc-nickel plated
New
Grade 10.9 flange bolt
Material35CrMoMOQ20,000 pcsLead time25 d
Get price
New
Stamped mounting bracket
MaterialSPCC 2–4 mmMOQ5,000 pcsLead time25 d
Get price
Spring steel clip
Material65MnMOQ10,000 pcsLead time20 d
Get price
Aluminium heat shield
Material1050 Al 0.5 mmMOQ2,000 pcsLead time30 d
Get price
Three CMMs measure every lot to the control plan. The report ships with the parts, unasked.
Twelve engineers review your drawing and flag cost-down options that keep the spec, before we quote.
No sub-tier suppliers. We control the schedule and quality across the whole line — 98.6% on-time delivery.
PSW, FMEA, control plan, MSA and material certs ship with the sample so approval takes one round.

Every programme has its own control plan. Gauges are calibrated every 6 months and test records are kept for 15 years per IATF.
Tier-1 suppliers on three continents keep programmes with AXLEON for 6.4 years on average
98.6% on-time delivery in 2025 · customer-detected defects ≤ 25 PPM · 14 customer audits, all passed
Attach 2D/3D files (STEP, DWG, PDF), material, annual volume and required standards. Our engineers reply with design notes and piece price.
Reply within one working day — English, Chinese and Thai